3 Phase Power Transformer for Power Grid and Substation

Application: Power, Electronic, Instrument, Lighting, Rectifier, Audio
Phase: Three
Core: Core-type Transformer
Cooling Method: Oil-immersed Type Transformer
Winding Type: Two-winding Transformer
Usage: Power
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
SZ11, S11, SFZ11
Coil Structure
Toroidal
Winding Material
High Grade Copper
Thickness of Silicon Sheet
0.27mm or 0.3mm
Tap Changer
Oltc
Certificates
Ctqc, CE, ISO9001, ISO14001
Transport Package
Sea Worthy Packing
Specification
CE, ROHS, SGS, GMP
Trademark
EACHER
Origin
Zhejiang, China (Mainland)
Production Capacity
50000 PCS/Year

Product Description

Packaging & Delivery
Packaging Details: Ply wood box for accessories, main body nude, tank fill in N2, supply compact detective device.
Delivery Detail: Depend on the quantity and type
Specifications

3 phase electric power transformer up to 230kv 230kv1. IEC, ANSI, BS, Standard. 2. KEMA, CESI Report 3. ISO, CE, Certificates

3 phase electric power transformer with different MVA and KV up to 220kv

Contact Person
Name: Scott Lee
 

Reason to choose us:

1. KEMA test report for the 50MVA 69KV power transformer.

2. CESI test report for the 100MVA 220KV transformer.

3. According to IEC, ANSI, BS and other international standards.

4. Not only experienced in designing and manufacturing, but also as well in installation and commission.

5. Perfect after-sale service system and 24 hours quick response.

6. Sold our products all over the world more than 50 countries.

Drawings of power transformer(140MVA 69KV example)
 Rated power (kVA)  H.V  (kV)  H.V. Tap range  L.V  (kV)  Vector Group  Impedance  (%)  No-load Loss    (kW) On-load Loss   (kW)  No-load Current (%)   Oil Weight (kg) Total weight (kg)   Overall dimension (mm)
 800  35/38.5    ±3*2.5%  6.3  Yd11  or  YNd11  6.5  1.06  9.98  1.05  1650  4790  2870*1810*2570
 1000   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11    6.5  1.26  12.16  1  1760  5210  3150*1890*2650
 1250   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11   6.5 1.49  14.63   0.9  2010  6080  3510*2040*2690
 1600   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11   6.5  1.8  17.58  0.85  1920  6610 3560*2070*2740 
 2000   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11   6.5  2.3  19.24  0.8  2160  7440  3680*2050*2850
 2500   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11  6.5    2.72  20.64  0.8  2580  8240  3780*2220*2890
 3150   35/38.5   ±3*2.5%    6.3   Yd11  or  YNd11  7  3.23  24.71  0.72  2680  8540  3850*2310*2950
 4000   35/38.5   ±3*2.5%  6.6   Yd11  or  YNd11  3.87  29.16  0.72  2960  11180  4120*2380*3150
 5000   35/38.5   ±3*2.5%  10   Yd11  or  YNd11  7  4.64  34.2  0.68  3050  12480  4210*2510*3220
 6300   35/38.5   ±3*2.5%  10.5   Yd11  or  YNd11  7.5  5.63  36.77  0.68  4050  15900  4320*3000*3290
 8000   35/38.5   ±3*2.5%  11  Yd11  or  YNd11  7.5   7.87  40.61  0.6  4200  17130  4500*3100*3680
 10000   35/38.5   ±3*2.5%     11   Yd11  or  YNd11  7.5  9.28  48.05  0.6  7480  25230 4560*3500*3750 
 12500   35/38.5   ±3*2.5%    11   Yd11  or  YNd11  8  10.94  56.86  0.56  8010  27000  4590*3580*3830
 16000   35/38.5   ±3*2.5%    11   Yd11  or  YNd11  13.17  70.32  0.54  8560  32500  4650*3700*4000
 20000   35/38.5   ±3*2.5%    11   Yd11  or  YNd11  8  15.57  82.78 0.54   10030  37770  5200*4200*4280
 25000   35/38.5   ±3*2.5%    11   Yd11  or  YNd11 8  18.96  101.65  0.5  12300  42600  5320*4350*4340
 31500    35/38.5   ±3*2.5%   11    Yd11  or  YNd11   8  22  119.7 0.45   13500 51100   5450*4420*4450
 ``` ```  ```  ```  ```  ```  ```  ```  ```  ```  ```  ```
Certifications
3 Phase Power Transformer for Power Grid and Substation

Certificates owned by shenda:
100MVA/220kv power transformer short circuit test report
-issued by CESI Italy&CTQC China

120MVA/33KV oil EAF transformer
50MVA/69KV oil power transformer
10MVA/33kv dry-type transformer
Type test report
-issued by KEMA Netherlands

63MVA/110KV Power transformer short circuit test report
-issued by CTQC China

12.5MVA/22KV Rectifier transformer routine test
-issued by V-Check korea

ISO 9001&ISO14001&OHSAS 18001
CE-POWER TRANSFORMER&FURNACE TRANSFORMER&DRY-TYPE TRANSFORMER&REACTOR

Transformer Characteristics
3 Phase Power Transformer for Power Grid and Substation
Winding .
The winding must be especially protected - both against high electrical stress due to
external over voltages and against mechanical overloads by short circuits. They are made of copper or aluminum. Low-voltage windings are made of strip or flat wire while
high voltage windings are manufactured from round or profile wire. ("diamond-dotted paper") bonds the winding into a compact block
while drying and increases the short-circuit capacity additionally.

3 Phase Power Transformer for Power Grid and Substation
Magnetic Core lamination.
The three-limb iron core is made of oblique cut Grain-oriented, seven-step silicon steel lamination insulated on both sides,
guaranteeing low losses and low noise. These values are even improved by laser treatment. It is protected on the surface with a
flash-proof varnish in order to prevent the sheet from corrosion and to reduce the noise.

3 Phase Power Transformer for Power Grid and Substation
Oil tank.
Whether during transport or operation -the tank must be absolutely tight under mechanical stress. We have vast constructional experience, the most modern calculation methods and high-quality welding work. Special attention is paid to
corrosion protection. Pretreatment of the surface is processed by phosphating pickling, contributes to corrosion protection, just
like multi-coating with preset drying times for each layer. On request, hot-dip galvanization provides for even better protection

3 Phase Power Transformer for Power Grid and Substation
Test lab
Testing are conducted for every transformer before delivery.Tests are classified to be routine tests and type test.
A - Routine tests: According to IEC 60076 standard , the following tests must be carried out for all units of the transformers
a- Measurement of winding resistance .
b- Measurement of voltage ratio and check of phase displacement.
c- Measurement of short circuit impedance and load losses.
d-Measurement of no-load losses and current .
e-Dielectric routine tests including the separate source AC voltage withstanding test and short duration induced over voltage withstanding test ( ACSD ) .

B - Type tests :
The following tests shall be carried out
a- Temperature rise test
b- Lightning impulse test

C - Special tests :
a- Determination of noise level according to IEC 60551 .
b- Oil leakage test
c- Overload test at 150 % rated current for one hour after temperature rise test ( top oil temperature rise and winding temperature rise must be measured and recorded in the report test also hot spot temperature rise must be calculated and recorded on the report test ) .
d- Short Circuit Dynamic stability Test (test report from independent and accredited laboratory for similar transformer will be accepted).


Packaging and transportation
3 Phase Power Transformer for Power Grid and Substation



Company Introduction
SHENDA electric group is a manufacturer and wholesale company that manufactures good & high quality electric transformers from 2000. The company provides the customized products and OEM service. The factory own the 3 production base worldwide,2 in China and 1 in USA.We also own a transformer research institute with more than 30 electric engineers .
3 Phase Power Transformer for Power Grid and Substation
Our Services
1. Pre-Sale Service
- Quick response: reply you within 8 hours, to save your time.
- Professional solution: supply professional completed solution base on your technical requirements,  to complete your technical plan.
- Quoataion: submit a competive price within 2 days, to promote your business

2. In Sale Service
- Supplying stipulated completed drawings
- Supplying manufacturing plan and processing photos
- Making the test plan and book hotel for the witness person
- Making good arrangement of the delivery and shipment

3. Afer Sale Service
- Supplying professional supervision and commissioning within 15 days
- Training the workers
- Providing 12 months waranty of quality and perforance

3 Phase Power Transformer for Power Grid and Substation

RFQ
1,Q:
Are you manufacturer?
 
   A:
Yes, we are manufacturer. Our factory is in JiangShan City, zhejiang  Province.
 
2,Q:
What is your delivery time ? 
 
   A:
Depend on the type of transformer.
 
3,Q:
What is your payment term?
 
  A:
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
 
4,Q:
Are your transformers supported for customization ?
 
  A:
Yes, of course. We can design and produce accroding to the technical requirements and parameters of customers.
 
5,Q:
Do you offer guarantee for the products?
 
   A:
Yes. Different transformers is different. We offer at least one year guarantee for all of our transformers.
 
6,Q:
Do you accept Factory Acceptance Test?
 
   A:
Yes. It's available. And we are responsible for each set transformer's testing (ICE).
 
7,Q:
Do you assign engineer for after-sale service?
 
   A:
Yes. For our products,we all provide after-sale installation instructions service
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
26
Year of Establishment
2007-11-07