• 138kv on Load Tap Changing Oil Immersed Power Transformer
  • 138kv on Load Tap Changing Oil Immersed Power Transformer
  • 138kv on Load Tap Changing Oil Immersed Power Transformer
  • 138kv on Load Tap Changing Oil Immersed Power Transformer

138kv on Load Tap Changing Oil Immersed Power Transformer

Application: Power
Phase: Three
Core: Core-type Transformer
Cooling Method: Oil-immersed Type Transformer
Winding Type: Multi-winding Transformer
Certification: ISO9001-2000, ISO9001
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
SZ11-100000/138-37
Frequency Characteristics
Low Frequency
Shape of Core
U
Brand
Shenda
Service Condition
Indoor/Outdoor
Tap Changer
Nltc/Oltc
Transport Package
Sea Worthy Packing
Specification
CE, ISO, IEC, GB, ANSI
Trademark
EACHER
Origin
Jiangshan City, Zhejiang Province, China

Product Description

Quick Details
Place of Origin: Zhejiang, China (Mainland)
Brand Name: EACHER
Model Number: SFZ11-50000/138
Usage: Power
Phase: Three
Coil Structure: Toroidal
Coil Number: Three-phase Two-winding
Packaging & Delivery
Packaging Details: Export worthy packing
Delivery Detail: 2~5 Months
Specifications
138kV/50000 kva Step up transf.
1) CTQC, ISO9001, ISO14001, CE
2) Apply for IEC, GB, ANSI
3) Up to 230kV, 180MVA
4) Low losses
Features:
1) Amount of local discharged: The apparent discharge amount is less than 80pC under 1.5 times of rated voltage;
2) Noise: Products of 63MVA and below is lower than 58 dB (AN);
3) Power loss: No-load loss is 30% lower than that of IEC standard;
4) Reliability: All in-service products have no damages or oil leakage occurred;

Application:
60 ~220 kV power system of power plant, substation, mining enterprise and etc.

Technologies:
Design: Relative developed software are adopted in Electromagnetic calculations, strength analysis, leakage magnetic distribution, its electro-dynamic force and electrical insulation.

Manufacture:
Core: Effectively upgrade transformer's no-load performance by below methods:
1) The core is made of high-permeable grain-orientated top quality cold-rolled silicon sheet and the material is cut with advanced Germany Geoge GmbH automatic shear line with the cut burs controlled within 0.02mm.
2) The silicon sheet fabrication adopts "no-upper yoke lapped' technology and all lapped joints of the silicon sheet are 45 full-miters. The laminated core sheets are integrally pressed and adhered with epoxy resin to make the three leg two-yoke core a strong and flat integral one with good verticality precision, this effectively improves no-load performance and reduces noises.
3) Bracing plates are used as support between coil leg and inner coil. The iron yoke is tied with epoxy resin-impregnated glass fiber band, and the lower section of oil tank is tightened with counter-pressure bolts.
Winding:
1) The high-voltage (HV) coil adopts an interleaved-continuous structure to improve the voltage characteristics under impact voltage and make voltage evenly distributed. All stays and pads are chamfered to keep highly reliable insulation.
2) In the transformer winding there is a zigzag oil guide structure so as to fully cool all areas inside the winding, lower the temperature rise of the winding and the hot points of the winding and prolong the service life of insulation. The HV and MV regulation system are independently provided with voltage-regulating winding to balance the ampere turn of each winding, effectively lower the axial electrodynamic force generated at short-circuit of transformer and improve abrupt short-circuit withstanding capacity.
3) The winding adopts radial "0" margin designed, between the core and the paper sleeve of LV winding, and between the LV, HV, voltage-regulating windings, as well as before insertion of stays and shroud plate they are fully dried and tightly matched to ensure extremely good compactness and concentricity of the entire winding.
Transformer Characteristics
138kv on Load Tap Changing Oil Immersed Power Transformer
Winding .
The winding must be especially protected - both against high electrical stress due to
external over voltages and against mechanical overloads by short circuits. They are made of copper or aluminum. Low-voltage windings are made of strip or flat wire while
high voltage windings are manufactured from round or profile wire. ("diamond-dotted paper") bonds the winding into a compact block
while drying and increases the short-circuit capacity additionally.

138kv on Load Tap Changing Oil Immersed Power Transformer
Magnetic Core lamination.
The three-limb iron core is made of oblique cut Grain-oriented, seven-step silicon steel lamination insulated on both sides,
guaranteeing low losses and low noise. These values are even improved by laser treatment. It is protected on the surface with a
flash-proof varnish in order to prevent the sheet from corrosion and to reduce the noise.

138kv on Load Tap Changing Oil Immersed Power Transformer
Oil tank.
Whether during transport or operation -the tank must be absolutely tight under mechanical stress. We have vast constructional experience, the most modern calculation methods and high-quality welding work. Special attention is paid to
corrosion protection. Pretreatment of the surface is processed by phosphating pickling, contributes to corrosion protection, just
like multi-coating with preset drying times for each layer. On request, hot-dip galvanization provides for even better protection

138kv on Load Tap Changing Oil Immersed Power Transformer
Test lab
Testing are conducted for every transformer before delivery.Tests are classified to be routine tests and type test.
A - Routine tests: According to IEC 60076 standard , the following tests must be carried out for all units of the transformers
a- Measurement of winding resistance .
b- Measurement of voltage ratio and check of phase displacement.
c- Measurement of short circuit impedance and load losses.
d-Measurement of no-load losses and current .
e-Dielectric routine tests including the separate source AC voltage withstanding test and short duration induced over voltage withstanding test ( ACSD ) .

B - Type tests :
The following tests shall be carried out
a- Temperature rise test
b- Lightning impulse test

C - Special tests :
a- Determination of noise level according to IEC 60551 .
b- Oil leakage test
c- Overload test at 150 % rated current for one hour after temperature rise test ( top oil temperature rise and winding temperature rise must be measured and recorded in the report test also hot spot temperature rise must be calculated and recorded on the report test ) .
d- Short Circuit Dynamic stability Test (test report from independent and accredited laboratory for similar transformer will be accepted).


Packaging and transportation
138kv on Load Tap Changing Oil Immersed Power Transformer



Company Introduction
SHENDA electric group is a manufacturer and wholesale company that manufactures good & high quality electric transformers from 2000. The company provides the customized products and OEM service. The factory own the 3 production base worldwide,2 in China and 1 in USA.We also own a transformer research institute with more than 30 electric engineers .
138kv on Load Tap Changing Oil Immersed Power Transformer
Our Services
1. Pre-Sale Service
- Quick response: reply you within 8 hours, to save your time.
- Professional solution: supply professional completed solution base on your technical requirements,  to complete your technical plan.
- Quoataion: submit a competive price within 2 days, to promote your business

2. In Sale Service
- Supplying stipulated completed drawings
- Supplying manufacturing plan and processing photos
- Making the test plan and book hotel for the witness person
- Making good arrangement of the delivery and shipment

3. Afer Sale Service
- Supplying professional supervision and commissioning within 15 days
- Training the workers
- Providing 12 months waranty of quality and perforance

138kv on Load Tap Changing Oil Immersed Power Transformer

RFQ
1,Q:
Are you manufacturer?
 
   A:
Yes, we are manufacturer. Our factory is in JiangShan City, zhejiang  Province.
 
2,Q:
What is your delivery time ? 
 
   A:
Depend on the type of transformer.
 
3,Q:
What is your payment term?
 
  A:
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
 
4,Q:
Are your transformers supported for customization ?
 
  A:
Yes, of course. We can design and produce accroding to the technical requirements and parameters of customers.
 
5,Q:
Do you offer guarantee for the products?
 
   A:
Yes. Different transformers is different. We offer at least one year guarantee for all of our transformers.
 
6,Q:
Do you accept Factory Acceptance Test?
 
   A:
Yes. It's available. And we are responsible for each set transformer's testing (ICE).
 
7,Q:
Do you assign engineer for after-sale service?
 
   A:
Yes. For our products,we all provide after-sale installation instructions service
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
26
Year of Establishment
2007-11-07