Power Transformer 110, 121, 132, 138, 154 Kv

Product Details
Customization: Available
Application: Power, Electronic, Instrument, Rectifier, Audio
Phase: Three

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
26
Year of Establishment
2007-11-07
  • Power Transformer 110, 121, 132, 138, 154 Kv
  • Power Transformer 110, 121, 132, 138, 154 Kv
  • Power Transformer 110, 121, 132, 138, 154 Kv
  • Power Transformer 110, 121, 132, 138, 154 Kv
  • Power Transformer 110, 121, 132, 138, 154 Kv
  • Power Transformer 110, 121, 132, 138, 154 Kv
Find Similar Products

Basic Info.

Model NO.
S9 S10 S11 S13 S9-M S10-M S11-M S13-M
Cooling Method
Oil-immersed Type Transformer
Winding Type
Two-winding Transformer
Certification
ISO9001-2000, ISO9001
Usage
Power Transformer
Frequency Characteristics
Power Frequency
Shape of Core
U
Transport Package
Sea Worthy Packing
Specification
CE, ROHS, SGS, GMP
Trademark
SHENDA
Origin
Jiangshan City, Zhejiang Province, China
Production Capacity
8000/Year

Product Description

Power Transformer 110, 121, 132, 138, 154 KvHigh voltage power transformer ratio range from 66KV to 220KV are the main products of SHENDA Electric which have many advantage both on quality and price. All the products has been fully tested and certificated before delivery.
Plenty of our products have been exported and applied in oversea markets regarding power plant, substation, mineral and ore industries.
Shenda electric is renowned and appreciated by its reliable products performance and integrated services.
Features:
1) Amount of local discharged: The apparent discharge amount is less than 80pC under 1.5 times of rated voltage;
2) Noise: Products of 63MVA and below is lower than 58 dB (AN);
3) Power loss: no-load loss is 30% lower than that of IEC standard;
4) Reliability: All in-service products have no damages or oil leakage occurred;
Application:
60 ~220 kV power system of power plant, substation, mining enterprise and etc.
Technologies:
Design: relative developed software are adopted in Electromagnetic calculations, strength analysis, leakage magnetic distribution, its electro-dynamic force and electrical insulation.
Manufacture:
Core: effectively upgrade transformer's no-load performance by below methods:
1) The core is made of high-permeable grain-orientated top quality cold-rolled silicon sheet and the material is cut with advanced Germany Geoge GmbH automatic shear line with the cut burs controlled within 0.02mm.
2) The silicon sheet fabrication adopts "no-upper yoke lapped' technology and all lapped joints of the silicon sheet are 45 full-miters. The laminated core sheets are integrally pressed and adhered with epoxy resin to make the three -leg two-yoke core a strong and flat integral one with good verticality precision, this effectively improves no-load performance and reduces noises.
3) Bracing plates are used as support between coil leg and inner coil. The iron yoke is tied with epoxy resin-impregnated glass fiber band, and the lower section of oil tank is tightened with counter-pressure bolts. The upper iron and the upper section of oil tan

Certificates
Power Transformer 110, 121, 132, 138, 154 Kv

Workshop
Power Transformer 110, 121, 132, 138, 154 Kv

Part of equipment
Power Transformer 110, 121, 132, 138, 154 Kv


Testing center
Power Transformer 110, 121, 132, 138, 154 Kv


Customer visiting
Power Transformer 110, 121, 132, 138, 154 Kv
FAQ

1. Q: Are you manufacturer or trading company?
A: Manufacturer

2. Q: What is your minimum order quantity?
A: 1 set.

3. Q: What is your delivery time?
A: Depend on the type of transformer.

4. Q: What is your payment term?
A: 30% advance by T/T, 70% before delivery by T/T or L/C
Or we can discuss about it.

5. Q: What kind of starndard you follow?
A: IEC, ANSI, CSA, GB, etc

6. Q: What kind of supporting documentation you can provide normally
A: Quotation, outlinedrawing, manufacturing plan, quality control plan
Testing plan, financial report, type test report(KEMA, CESI), reference list, etc

6. Q: What is your normal wanrranty period?
A: 12 months after transformer operation.

7. Q: Can u do installation and commissioningin user's site?
A: Yes, we can send our installation team to user's country for service.

8. Q: Do you have any experience in this kind of transformer?
A: Yes, we can provide reference list for check.

Any need for power transformer, please feel free to contact us:
Lluvia | Oversea sales | Oversea Dept.
Shenda Electic Group Co., L

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier