35kv 25mva Three Phase Arc Furnace Transformer

Product Details
Customization: Available
Application: Arc Furnace Transformer
Phase: Three

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
26
Year of Establishment
2007-11-07
Find Similar Products

Basic Info.

Model NO.
HSSPZ-25000/35
Cooling Method
Oil-immersed Type Transformer
Winding Type
Two-winding Transformer
Certification
ISO9001-2000, ISO9001
Usage
Arc Furnace Transformer
Frequency Characteristics
Power Frequency
Shape of Core
Kou Type
Brand
Eacher
Service Condition
Indoor
Tap Changer
Nltc/Oltc
Cooling Type
Ofwf/Onan
Core Structure
Toroidal
High Voltage Range
6-11kv
Iron Core
Silicon Sheet
Loss
Low Loss
Transport Package
Sea Worthy Packing
Specification
CE, ISO, IEC, GB, ANSI
Trademark
EACHER
Origin
Jiangshan City, Zhejiang Province, China
Production Capacity
6000sets Per Year

Product Description

35kv 25mva three phase arc furnace transformer

1. Top three in China, advanced performance
2. CE, IEC, ANSI
3. ISO, OHSAS
4. Up to 150MVA


ladle furnace transformer



Our Services

1. Pre-Sale Service

- Quick response: reply you within 8 hours, to save your time.

- Professional solution: supply professional completed solution base on your technical requirements,  to complete your technical plan.

- Quoataion: submit a competive price within 2 days, to promote your business



2. In Sale Service

- Supplying stipulated completed drawings

- Supplying manufacturing plan and processing photos

- Making the test plan and book hotel for the witness person

- Making good arrangement of the delivery and shipment



3. Afer Sale Service

- Supplying professional supervision and commissioning within 15 days

- Training the workers

- Providing 12 months waranty of quality and perforance


Application:

Arc furnaces are used in steel industry for smelting scrap iron and for refining steel.  Other application areas are :

1)    Smelting glass and ceramics

2)    Manufacturing or refining many other materials etc. ferrochromium, ferromanganese, different abrasive materials (oxides and nitrides), semiconducting base materials, nanopowders etc.

3)    Electric arc furnace (EAF) transformers are required for many different furnace processes and applications . they are built for :

a , Steel furnaces, mainly long arc

b, Landle furnaces

c, ferro-alloy furnace and similar with short or submerged are

d,Smelting of other materials


Features:

1)       Low loss

2)       Low noise

3)       High efficiency

4)       Low partial discharge

5)       Strong mechanical strength and short-circuit withstand ability .

6)       Operation reliability

7)       Easy maintenance

8)       Pretty outline and compact structure

9)       100% guaranteed no leakage



Brief specification

1)       Voltage class: 6~110 KV

2)       Capacity : 630 KVA to 120,000 KVA

3)       Short-circuit impedance : 4.5~21%

4)       Losses : No-load losses is fully comply with IEC standard requirements

35kV Furnace Transformer Technical Parameters
 
Type Rated power
(kVA)
Connection
symbol
Primary voltage
(kV)
Secondary Voltage
(v)
Regulation voltage step Type of taping short-circuit impedance(%) No-load loss On-load loss
HSSPZ-1500/35 1500 Yd11 35 290~157 10 On-load 5.5 2.6 23
HSSP-3200/35 3200 D-Y,d0-11 35 240~138 4 No-load 7 5.3 41.1
HSSPK-3200/35 3200 D-Y,d0-11 35 240~138 5 No-load 18.65 5.3 91.1
HJSSP-5000/35 5000 Yd11 35 212~155 5 No-load 7.5 9.3 55
HJSSP-5500/35 5500 Yd11 35 240~130 6 No-load 7 9.1 52.5
HJSSP-7000/35 7000 Yd11 35 240~140 8 No-load 6.5 9.4 77
HJSSPZ-9000/35 9000 Yd11 35 239~163 9 On-load 8.5 11.6 97
HSSP-9000/35 9000 Yd11 35 320~180 8 No-load 6 11 116
HJSSPZ-10000/35 10000 Yd11 35 260~188 9 On-load 8.5 17.2 187
HSSPZ-10000/35 10000 Yd11 35 300~160 13 On-load 6.5 12 97
HSSPZ-12500/35 12500 Yd11 35 250~150 9 On-load 9 19.7 134
HSSP-12500/35 12500 Yd11 35 340~195 11 No-load 8 13.9 154
HSSP-15000/35 15000 D-Y,d0-11 35 353~160 8 No-load 8 20 107
HSSPZ-16000/35 16000 Yd11 35 375~200 15 On-load 7 16.4 16.1
HJSSPZ-16000/35 16000 Yd11 35 310~190 13 On-load 7 19.2 195.6
HSSPZ-20000/35 20000 Yd11 35 400~270 13 On-load 7 20.7 207.7
HJSSPZ-20000/35 20000 Dd0 35 320~170 11 On-load 6.5 30.4 30.4
HSSPZ-25000/35 25000 Yd11 35 509~302 13 On-load 7.5 28.5 28.5
Certifications
35kv 25mva Three Phase Arc Furnace Transformer

Certificates owned by shenda:
100MVA/220kv power transformer short circuit test report
-issued by CESI Italy&CTQC China

120MVA/33KV oil EAF transformer
50MVA/69KV oil power transformer
10MVA/33kv dry-type transformer
Type test report
-issued by KEMA Netherlands

63MVA/110KV Power transformer short circuit test report
-issued by CTQC China

12.5MVA/22KV Rectifier transformer routine test
-issued by V-Check korea

ISO 9001&ISO14001&OHSAS 18001
CE-POWER TRANSFORMER&FURNACE TRANSFORMER&DRY-TYPE TRANSFORMER&REACTOR

Transformer Characteristics
35kv 25mva Three Phase Arc Furnace Transformer
Winding .
The winding must be especially protected - both against high electrical stress due to
external over voltages and against mechanical overloads by short circuits. They are made of copper or aluminum. Low-voltage windings are made of strip or flat wire while
high voltage windings are manufactured from round or profile wire. ("diamond-dotted paper") bonds the winding into a compact block
while drying and increases the short-circuit capacity additionally.

35kv 25mva Three Phase Arc Furnace Transformer
Magnetic Core lamination.
The three-limb iron core is made of oblique cut Grain-oriented, seven-step silicon steel lamination insulated on both sides,
guaranteeing low losses and low noise. These values are even improved by laser treatment. It is protected on the surface with a
flash-proof varnish in order to prevent the sheet from corrosion and to reduce the noise.

35kv 25mva Three Phase Arc Furnace Transformer
Oil tank.
Whether during transport or operation -the tank must be absolutely tight under mechanical stress. We have vast constructional experience, the most modern calculation methods and high-quality welding work. Special attention is paid to
corrosion protection. Pretreatment of the surface is processed by phosphating pickling, contributes to corrosion protection, just
like multi-coating with preset drying times for each layer. On request, hot-dip galvanization provides for even better protection

35kv 25mva Three Phase Arc Furnace Transformer
Test lab
Testing are conducted for every transformer before delivery.Tests are classified to be routine tests and type test.
A - Routine tests: According to IEC 60076 standard , the following tests must be carried out for all units of the transformers
a- Measurement of winding resistance .
b- Measurement of voltage ratio and check of phase displacement.
c- Measurement of short circuit impedance and load losses.
d-Measurement of no-load losses and current .
e-Dielectric routine tests including the separate source AC voltage withstanding test and short duration induced over voltage withstanding test ( ACSD ) .

B - Type tests :
The following tests shall be carried out
a- Temperature rise test
b- Lightning impulse test

C - Special tests :
a- Determination of noise level according to IEC 60551 .
b- Oil leakage test
c- Overload test at 150 % rated current for one hour after temperature rise test ( top oil temperature rise and winding temperature rise must be measured and recorded in the report test also hot spot temperature rise must be calculated and recorded on the report test ) .
d- Short Circuit Dynamic stability Test (test report from independent and accredited laboratory for similar transformer will be accepted).


Packaging and transportation
35kv 25mva Three Phase Arc Furnace Transformer



Company Introduction
SHENDA electric group is a manufacturer and wholesale company that manufactures good & high quality electric transformers from 2000. The company provides the customized products and OEM service. The factory own the 3 production base worldwide,2 in China and 1 in USA.We also own a transformer research institute with more than 30 electric engineers .
35kv 25mva Three Phase Arc Furnace Transformer
Our Services
1. Pre-Sale Service
- Quick response: reply you within 8 hours, to save your time.
- Professional solution: supply professional completed solution base on your technical requirements,  to complete your technical plan.
- Quoataion: submit a competive price within 2 days, to promote your business

2. In Sale Service
- Supplying stipulated completed drawings
- Supplying manufacturing plan and processing photos
- Making the test plan and book hotel for the witness person
- Making good arrangement of the delivery and shipment

3. Afer Sale Service
- Supplying professional supervision and commissioning within 15 days
- Training the workers
- Providing 12 months waranty of quality and perforance

35kv 25mva Three Phase Arc Furnace Transformer

RFQ
1,Q:
Are you manufacturer?
 
   A:
Yes, we are manufacturer. Our factory is in JiangShan City, zhejiang  Province.
 
2,Q:
What is your delivery time ? 
 
   A:
Depend on the type of transformer.
 
3,Q:
What is your payment term?
 
  A:
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
 
4,Q:
Are your transformers supported for customization ?
 
  A:
Yes, of course. We can design and produce accroding to the technical requirements and parameters of customers.
 
5,Q:
Do you offer guarantee for the products?
 
   A:
Yes. Different transformers is different. We offer at least one year guarantee for all of our transformers.
 
6,Q:
Do you accept Factory Acceptance Test?
 
   A:
Yes. It's available. And we are responsible for each set transformer's testing (ICE).
 
7,Q:
Do you assign engineer for after-sale service?
 
   A:
Yes. For our products,we all provide after-sale installation instructions service
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier