220kv 40000kVA Three Phase Two Winding No-Load-Tap-Changing Power Transformer

Product Details
Customization: Available
Application: Power
Phase: Three

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
26
Year of Establishment
2007-11-07
Find Similar Products

Basic Info.

Model NO.
S-40000kva/20kv
Core
Core-type Transformer
Cooling Method
Oil-immersed Type Transformer
Winding Type
Two-winding Transformer
Certification
ISO9001-2000, ISO9001
Usage
Power Transformer
Frequency Characteristics
Power Frequency
Shape of Core
Kou Type
Brand
Eacher
Service Condition
Indoor/Outdoor
Tap Changer
Nltc/Oltc
Cooling Type
Ofwf/Onan
Core Structure
Toroidal
High Voltage Range
220-242kv
Iron Core
Silicon Sheet
Loss
Low Loss
Transport Package
Sea Worthy Packing
Specification
CE, ISO, IEC, GB, ANSI
Trademark
EACHER
Origin
Jiangshan City, Zhejiang Province, China
Production Capacity
6000sets Per Year

Product Description

220kv 40000kva three phase two winding no-load-tap-changing power transformer

Specifications
1 power transformer
2 ISO9001,ISO14001,OHSAS 18001, CE
3 Apply for IEC, ANSI
4.KEMA

Features:
1) Amount of local discharged: The apparent discharge amount is less than 80pC under 1.5 times of rated voltage;
2) Noise: Products of 63MVA and below is lower than 58 dB (AN);
3) Power loss: no-load loss is 30% lower than that of IEC standard;
4) Reliability: All in-service products have no damages or oil leakage occurred;

Application:
60 ~220 kV power system of power plant, substation, mining enterprise and etc.

Technologies:
Design: relative developed software are adopted in Electromagnetic calculations, strength analysis, leakage magnetic distribution, its electro-dynamic force and electrical insulation.

Manufacture:
Core: effectively upgrade transformer's no-load performance by below methods:
1) The core is made of high-permeable grain-orientated top quality cold-rolled silicon sheet and the material is cut with advanced Germany Geoge GmbH automatic shear line with the cut burs controlled within 0.02mm.
2) The silicon sheet fabrication adopts "no-upper yoke lapped' technology and all lapped joints of the silicon sheet are 45 full-miters. The laminated core sheets are integrally pressed and adhered with epoxy resin to make the three leg two-yoke core a strong and flat integral one with good verticality precision, this effectively improves no-load performance and reduces noises.
3) Bracing plates are used as support between coil leg and inner coil. The iron yoke is tied with epoxy resin-impregnated glass fiber band, and the lower section of oil tank is tightened with counter-pressure bolts. The upper iron and the upper section of oil tank are fixed at three locations. Hence the body inside the oil tank can withstand the vibration during transportation without any shift.

Winding:
1) The high-voltage (HV) coil adopts an interleaved-continuous structure to improve the voltage characteristics under impact voltage and make voltage evenly distributed. All stays and pads are chamfered to keep highly reliable insulation.
2) In the transformer winding there is a zigzag oil guide structure so as to fully cool all areas inside the winding, lower the temperature rise of the winding and the hot points of the winding and prolong the service life of insulation. The HV and MV regulation system are independently provided with voltage-regulating winding to balance the ampere turn of each winding, effectively lower the axial electrodynamic force generated at short-circuit of transformer and improve abrupt short-circuit withstanding capacity.
3) The winding adopts radial "0" margin designed, between the core and the paper sleeve of LV winding, and between the LV, HV, voltage-regulating windings, as well as before insertion of stays and shroud plate they are fully dried and tightly matched to ensure extremely good compactness and concentricity of the entire winding.

Oil tank and accessories
1) The tank wall adopts wide steel sheet, which will be folded into corrugated structure without splicing, in this way welds are decreased and mechanical strength is enhanced, meanwhile, the corrugated wall has diverging effect, and thus plays a role in decrease of noise. The routing troughs and control cabinets of the secondary circuit are all made of stainless steel, so the entire transformer has a simple and good looking.
2) All sealing surface use quality sealing material and are precision-machined.
3) On the edge of the tank there are double sealing grooves, and the outer sealing material is used to shade the atmosphere and ultra-ray to protect the inner sealing being damaged, thus at utmost prolonging service life and enhancing reliability of the seal.

Power transforer main Technical Parameters for 220kV power transformer Level S(F)S9, S(F)S10, S(F)S11 Serie power transformers three-phase three winding on-load-tap-changing power transformer:
 

Rated power
(kVA)

High Voltage
(kV)

H.V Tap range

Low Voltage
(kV)

Connection Symbol

Short-Circuit Impedance
(%)

No-load Loss
(kW)

On-Load Loss
(kW)

No-load Current
(%)
9 Type 10 Type 11 Type 9 Type 10 Type 11 Type
31500 220
242
±8×1.25%
±8×1.5%
6.3,6.6,
10.5,11,
20,34.5,
35,37,
38.5,66,
69
YNd11 12~14 38 34 30 135 128 128 0.7
40000 45 41 36 157 149 149 0.63
50000 54 49 43 189 180 180 0.56
63000 63 57 50 220 209 209 0.56
90000 80 72 64 288 274 274 0.49
120000 99 89 79 346 329 329 0.49
150000 116 104 93 405 385 385 0.42
180000 135 122 108 468 445 445 0.42

three-phase three winding no-load-tap-changing power transformer:

Rated power
(kVA)

High Voltage
(kV)

H.V Tap range

Low Voltage
(kV)

Connection Symbol

Short-Circuit Impedance
(%)

No-load Loss
(kW)

On-Load Loss
(kW)

No-load Current
(%)
9 Type 10 Type 11 Type 9 Type 10 Type 11 Type
31500 220
242
±8×1.25%
±8×1.5%
6.3,6.6,
10.5,11,
13.8,15.75,
18,20,
35,38.5
YNd11 12~14 35 32 28 135 128 128 0.7
40000 41 37 33 157 149 149 0.7
50000 49 44 39 189 180 180 0.65
63000 58 52 46 220 209 209 0.65
90000 77 69 62 288 274 274 0.55
120000 94 85 75 345 328 328 0.55
150000 112 101 90 405 385 385 0.5
180000 128 115 102 459 436 436 0.46

Certifications
220kv 40000kVA Three Phase Two Winding No-Load-Tap-Changing Power Transformer

Certificates owned by shenda:
100MVA/220kv power transformer short circuit test report
-issued by CESI Italy&CTQC China

120MVA/33KV oil EAF transformer
50MVA/69KV oil power transformer
10MVA/33kv dry-type transformer
Type test report
-issued by KEMA Netherlands

63MVA/110KV Power transformer short circuit test report
-issued by CTQC China

12.5MVA/22KV Rectifier transformer routine test
-issued by V-Check korea

ISO 9001&ISO14001&OHSAS 18001
CE-POWER TRANSFORMER&FURNACE TRANSFORMER&DRY-TYPE TRANSFORMER&REACTOR

Transformer Characteristics
220kv 40000kVA Three Phase Two Winding No-Load-Tap-Changing Power Transformer
Winding .
The winding must be especially protected - both against high electrical stress due to
external over voltages and against mechanical overloads by short circuits. They are made of copper or aluminum. Low-voltage windings are made of strip or flat wire while
high voltage windings are manufactured from round or profile wire. ("diamond-dotted paper") bonds the winding into a compact block
while drying and increases the short-circuit capacity additionally.

220kv 40000kVA Three Phase Two Winding No-Load-Tap-Changing Power Transformer
Magnetic Core lamination.
The three-limb iron core is made of oblique cut Grain-oriented, seven-step silicon steel lamination insulated on both sides,
guaranteeing low losses and low noise. These values are even improved by laser treatment. It is protected on the surface with a
flash-proof varnish in order to prevent the sheet from corrosion and to reduce the noise.

220kv 40000kVA Three Phase Two Winding No-Load-Tap-Changing Power Transformer
Oil tank.
Whether during transport or operation -the tank must be absolutely tight under mechanical stress. We have vast constructional experience, the most modern calculation methods and high-quality welding work. Special attention is paid to
corrosion protection. Pretreatment of the surface is processed by phosphating pickling, contributes to corrosion protection, just
like multi-coating with preset drying times for each layer. On request, hot-dip galvanization provides for even better protection

220kv 40000kVA Three Phase Two Winding No-Load-Tap-Changing Power Transformer
Test lab
Testing are conducted for every transformer before delivery.Tests are classified to be routine tests and type test.
A - Routine tests: According to IEC 60076 standard , the following tests must be carried out for all units of the transformers
a- Measurement of winding resistance .
b- Measurement of voltage ratio and check of phase displacement.
c- Measurement of short circuit impedance and load losses.
d-Measurement of no-load losses and current .
e-Dielectric routine tests including the separate source AC voltage withstanding test and short duration induced over voltage withstanding test ( ACSD ) .

B - Type tests :
The following tests shall be carried out
a- Temperature rise test
b- Lightning impulse test

C - Special tests :
a- Determination of noise level according to IEC 60551 .
b- Oil leakage test
c- Overload test at 150 % rated current for one hour after temperature rise test ( top oil temperature rise and winding temperature rise must be measured and recorded in the report test also hot spot temperature rise must be calculated and recorded on the report test ) .
d- Short Circuit Dynamic stability Test (test report from independent and accredited laboratory for similar transformer will be accepted).


Packaging and transportation
220kv 40000kVA Three Phase Two Winding No-Load-Tap-Changing Power Transformer



Company Introduction
SHENDA electric group is a manufacturer and wholesale company that manufactures good & high quality electric transformers from 2000. The company provides the customized products and OEM service. The factory own the 3 production base worldwide,2 in China and 1 in USA.We also own a transformer research institute with more than 30 electric engineers .
220kv 40000kVA Three Phase Two Winding No-Load-Tap-Changing Power Transformer
Our Services
1. Pre-Sale Service
- Quick response: reply you within 8 hours, to save your time.
- Professional solution: supply professional completed solution base on your technical requirements,  to complete your technical plan.
- Quoataion: submit a competive price within 2 days, to promote your business

2. In Sale Service
- Supplying stipulated completed drawings
- Supplying manufacturing plan and processing photos
- Making the test plan and book hotel for the witness person
- Making good arrangement of the delivery and shipment

3. Afer Sale Service
- Supplying professional supervision and commissioning within 15 days
- Training the workers
- Providing 12 months waranty of quality and perforance

220kv 40000kVA Three Phase Two Winding No-Load-Tap-Changing Power Transformer

RFQ
1,Q:
Are you manufacturer?
 
   A:
Yes, we are manufacturer. Our factory is in JiangShan City, zhejiang  Province.
 
2,Q:
What is your delivery time ? 
 
   A:
Depend on the type of transformer.
 
3,Q:
What is your payment term?
 
  A:
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
 
4,Q:
Are your transformers supported for customization ?
 
  A:
Yes, of course. We can design and produce accroding to the technical requirements and parameters of customers.
 
5,Q:
Do you offer guarantee for the products?
 
   A:
Yes. Different transformers is different. We offer at least one year guarantee for all of our transformers.
 
6,Q:
Do you accept Factory Acceptance Test?
 
   A:
Yes. It's available. And we are responsible for each set transformer's testing (ICE).
 
7,Q:
Do you assign engineer for after-sale service?
 
   A:
Yes. For our products,we all provide after-sale installation instructions service
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier