Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer

Product Details
Customization: Available
Application: Rectifier
Phase: Three

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
26
Year of Establishment
2007-11-07
  • Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer
  • Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer
  • Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer
  • Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer
Find Similar Products

Basic Info.

Model NO.
ZS-3700/35-0.44×2
Cooling Method
Oil-immersed Type Transformer
Winding Type
Two-winding Transformer
Certification
ISO9001-2000, Cesi Kema CE ISO9000 ISO14001 OHSAS18001 CSA
Usage
Rectifier Transformer
Frequency Characteristics
Power Frequency
Shape of Core
Ring
Brand
Shenda
Coil Struction
Toroidal
Place of Origin
Jiangshan, Zhejiang
Transport Package
Seaworthy Packing
Specification
CE, ISO, IEC, GB, ANSI
Trademark
EACHER
Origin
Jiangshan City, Zhejiang Province, China
Production Capacity
50000 Sets Per Year

Product Description

Company Introduction

Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer

Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer


Shenda ( In full: Shenda Electric Group Co.,Ltd.)  is one of the leading manufacturers in the power transmission & distribution industry. Founded in 2000 and currently employs about 1,100 employees worldwide. Shenda operates four factories (three in China and one in the United States of America - R. E. Uptegraff Manufacturing Company, LLC of Pennsylvania, U.S.A.).  Shenda also owns other ten subsidiaries throughout China. The annual gross sales is USD$250 million in 2015.

Shenda's annual total production capacity is about 18,000,000 KVA, Our main products include oil immersed power transformer(up to 250MVA/ 330kV) , dry type transformer(up to 20MVA/35kV), combined transformer substation, amorphous alloy transformer, rectifier transformer (100MVA/220kV )and especially furnace transformer(180MVA/220kV). Our products' performance measures up to the standards established by International Electric Committee (IEC). 

shendaelectric.en.made-in-china.com

Certifications
100MVA/220kv power transformer short circuit test report
-issued by CESI Italy&CTQC China

120MVA/33KV oil EAF transformer
50MVA/69KV oil power transformer
10MVA/33kv dry-type transformer
Type test report
-issued by KEMA Netherlands

63MVA/110KV Power transformer short circuit test report
-issued by CTQC China

12.5MVA/22KV Rectifier transformer routine test
-issued by V-Check korea

ISO 9001&ISO14001&OHSAS 18001
CE-POWER TRANSFORMER&FURNACE TRANSFORMER&DRY-TYPE TRANSFORMER&REACTOR
Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer

Test lab
Testing are conducted for every transformer before delivery.Tests are classified to be routine tests and type test.
A - Routine tests: According to IEC 60076 standard , the following tests must be carried out for all units of the transformers
- Measurement of winding resistance .
- Measurement of voltage ratio and check of phase displacement.
- Measurement of short circuit impedance and load losses.
-Measurement of no-load losses and current .
-Dielectric routine tests including the separate source AC voltage withstanding test and short duration induced over voltage withstanding test ( ACSD ) .

B - Type tests :
The following tests shall be carried out
- Temperature rise test
- Lightning impulse test

C - Special tests :
- Determination of noise level according to IEC 60551 .
- Oil leakage test
- Overload test at 150 % rated current for one hour after temperature rise test ( top oil temperature rise and winding temperature rise must be measured and recorded in     the report test also hot spot temperature rise must be calculated and recorded on the report test ) .
- Short Circuit Dynamic stability Test (test report from independent and accredited laboratory for similar transformer will be accepted).

Client inspection
Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer

Packaging and transportation
Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 3700kVA 35kv Rectifier Transformer
Factory documentation
1 Technical parameters
2 Outline drawing
3 Lifting diagram
4 Nameplate drawing
5 Control box drawing
6 Transportation diagram
7 Transformer install manual
8 Transformer operation / Maintenance instruction
9 Principles parts / components ex-work certification and operation instruction
10 Recommended spare part for 2-5 years operation
11 Test reports (routine test / type test / special test)
12 Etc…

Engineering Services
During the design process, client will be permitted to come to factory to take a supervision and guidance, manufacture and acceptance test.
We provide engineering services like pre-commissioning / commissioning / install and operation consult support / technicians training on site.
We provide after-sales service.
We provide 12 months warranty of quality and performance


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier