• Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer
  • Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer
  • Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer
  • Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer
  • Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer
  • Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer

Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer

Certification: CE, ISO
Place Style: Vertical
Range of Applications: Industrial
Type: Electric Holding Furnace
Usage: Smelting Steel Plant
Fuel: Electric
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
HSSPZ-56000/35-0.8-0.65-0.4
Transport Package
Sea Worthy Packing
Specification
Total weight 58600kg
Trademark
EACHER
Origin
China
HS Code
8504231100
Production Capacity
5000 Pieces Per Year

Product Description

Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer

UP FURNACE CO., LTD. was founded in 2018, a wholly-owned subsidiary of SHENDA ELECTRIC GROUP CO.,LTD, specializes in R&D, manufacturing, installation, maintenance and transformation of electric furnace products and EPC contracting business of metallurgical engineering. It is an emerging company for various large-scale steelmaking electric arc furnaces, ladle refining furnaces and large non-standard heat treatment furnace and other products in China.

Design and manufacturing capability:
1.Steelmaking electric arc furnace: the main equipment for smelting scrap steel, currently widely used three-phase AC arc smelting, there are three kinds of power configuration of ordinary power, high power and ultra-high power, rated capacity from 1.5t to 150t.
2.Ladle refining furnace: including LF, VD, VOD, VAD, RH and other furnace types, the most commonly used is LF ladle refining furnace, rated capacity from 10t to 300t.
3.Submerged arc furnace: mainly includes ferrosilicon furnace, ferromanganese furnace, ferrochromium furnace, ferronickel furnace, calcium carbide furnace, industrial silicon furnace, etc. The power is from 6300KVA to 48000KVA.
                                  
ELECTRIC ARC FURNANCE
Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer
Steelmaking electric arc furnace is divided into normal power, high power and ultra high power according to matched power. It also can be divided into independent foundation, conjoined foundation, large pivotal bearing and four connecting link structure by roof rotating mechanism. There are left operation and right operation types for user's selection. According to the loading method, it can be divided into horizontal continuous feeding type electric arc furnace and furnace lid rotating top-opening feeding type electric arc furnace.The electric arc furnace consists of furnace body, furnace roof, tilting device, furnace lifting & rotating device, electrode lifting device, water-cooling device, hydraulic device, furnace transformer, secondary busbar, HV cabinet, LV electric and automatic control system etc, Capacity of EAF manufactured by our company is 10t-220t.

product series
Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer
Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer

Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer

Executive Standard
JB/T3837-96                Production Model Formation Method for Transformer
JB/T8636-97                Power Converter Transformer
GB1094.1-2-1996        Power Transformer
GB1094.3-5-2003        Power Transformer
JB5344.1-1991            General for Ore Furnace Transformer
JB/T 5344.1-2004        General for Submerged Furnace Transformer
JB/T 6303-2004           Technical Specification and Requirement for Calcium-Carbid Furnace Transformer

Site condition
1.Altitude Above sea level≤1000m
2. Max. Temperature: +40ºC, Min. Temperature: -25ºC, Max. daily temperature difference: 25ºC,Relative Temperature: 90%.
3.Max. wind speed :35m/s
4.Earthquake intensity: seismic acceleration ( Horizontal : 0.1g and Vertical: 0.2g simultaneously) the seismic force safety factor which transformer can support≥1.67.

Main structure features and protection
1.Wire inlet and outlet type: Wire inlet from the top tank cover, secondary wire outlet from side (inside delta)
2.Structure:Oil tank is cover type, core hanging free structure
3.Water cooler adopts stainless bolt spiral plate water cooler
4.Secondary wire leading out: Each phase of transformer has 4 water cooler tube
5.Oil tank uses folded plate, has advantages as high mechanical strength, good appearance, few welding line and no leakage
6.Sealing: secondary wire-out terminals adopt epoxy casting resin structure, Magnetic separation of double pressed plate, to make sure no leakage from wire-out terminals. Tank rim and hand hole adopt one formation acrylate rubber gasket which resistant high temperature, oil resistant, resistant to oxidation to make sure no leakage from sealing cover.
7.Oil drain valve is high quality copper valve. Butterfly valve for cooler is vacuum type.
8.Oil conservator: Full sealed oil conservator with rubber bag matched with magnetic type oil level gauge
9.Terminal box: Stainless material
10. Gas relay on the main oil tank for fault alarm, fault trip; adopts pointer type oil level gauge to indicate the high or low oil level alarm; Gas relay on On-load tap changer for fault trip; temperature thermometer adopts BWY-802A(4-20mA) has remote connector with display when oil temperature overheat will deliver alarm signal; pressure relief valve will deliver trip signal when the tank pressure is too high,
11.The primary of transformer installed with current transformer and matched with current converter

Shenda quality management:
Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer

Cesi Kema IEEE IEC ISO CE 20 Years Professional Transformer Manufacturer 56000kVA 35kv Electric Arc Furnace Transformer
  • 100MVA/220KV power transformer --- short circuit test report from CESI Italy
  • 120MVA/33KV EAF transformer; 50MVA/69KV Oil power transformer; 10MVA/33KV Dry type transformer ---Type test report from KEMA Netherlands
  • 63MVA/110KV Power transformer ---short circuit Test report - Issued by CTQC China
  • 12.5MVA/22KV Rectifier transformer--- routine test - Issued by V-check Korea
  • ISO9001&ISO14001&OHSAS18001
  • Power transformer & Furnace transformer & dry type transformer & Reactor  ---CE
Factory documentation Model
1 Technical parameters
2 Outline drawing
3 Lifting diagram
4 Nameplate drawing
5 Control box drawing
6 Transportation diagram
7 Transformer install manual
8 Transformer operation / Maintenance instruction
9 Principles parts / components ex-work certification and operation instruction
10 Recommended spare part for 2-5 years operation
11 Test reports (routine test / type test / special test)
12 Etc…

During the design process, client will be permitted to come to factory to take a supervision and guidance, manufacture and acceptance test.
We provide engineering services like pre-commissioning / commissioning / install and operation consult support / technicians training on site.
We provide after-sales service.
We provide 12 months warranty of quality and performance

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
26
Year of Establishment
2007-11-07