Furnace Transformer for 10000kVA Three Phase Oil Arc Transformer

Product Details
Customization: Available
Type: Furnace Transformer
Usage: Power

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
26
Year of Establishment
2007-11-07
Find Similar Products

Basic Info.

Model NO.
HJSSPZ-10000/35
Coil Structure
Toroidal
Packaging Details
Sea Worthy Packing
Delivery Detail
1~3 Months
Transport Package
Sea Worthy Packing
Specification
ISO9001, ISO14001, CE Apply for IEC, JB, ANSI
Trademark
EACHER
Origin
Zhejiang, China (Mainland)
Production Capacity
10000 PCS/Year

Product Description

Specifications

Furnace trans. 1) Top 1 in China: 120MVA EAF trans. 2) ISO9001, ISO14001, CE 3) Apply for IEC, JB, ANSI 4) Up to 110kV, 160MVA



Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents which are the main products of Shenda Electric with many advantages both on quality and price. As an example a 30MVA unit at 150V would result in a secondary current of 115 kilo ampere. For these high secondary currents special bushings are required to be connected to the bus-bars. These bushings are specified with very specific arrangements to suit the bus-bar arrangement and cooling system. Furnace bus-bar are mostly water-cooled. The cooler are either of the oil forced (OFAF) or Oil forced water OFWF).

Shenda electric is renowned and appreciated by its reliable products performance and integrated services.
Features:
1) Low loss
2) Low noise
3) High efficiency
4) Low partial discharge
5) Strong mechanical strength and short-circuit withstand ability.
6) Operation reliability
7) Easy maintenance
8) Pretty outline and compact structure
9) 100% guaranteed no leakage
Application:
Arc furnaces are used in steel industry for smelting scrap iron and for refining steel. Other application areas are:
1) Smelting glass and ceramics
2) Manufacturing or refining many other materials etc. Ferrochromium, ferromanganese, different abrasive materials (oxides and nitrides), semiconducting base materials, nanopowders etc.
3) Electric arc furnace (EAF) transformers are required for many different furnace processes and applications. They are built for:
A, Steel furnaces, mainly long arc
B, Landle furnaces
C, ferro-alloy furnace and similar with short or submerged are
D, Smelting of other materials
 Type  Rated Power (kVA)  Connection Symbol  Primary Voltage (kV)  Secondary Voltage (V) Regulation Voltage Step  Type of Taping  Short-Circuit Impedance (%)   No-Load Loss (W) On-Load Loss (W)  Active Part Weight (kg)   Oil Weight (kg)  Transportation Weight (kg)  ToTal Weight
 HKS 1000/10  1000  Dd0  10  72-64  5  No-Load 6.5   3.02  14  2.9  2.87 7.965   7.965
 HKS-1600/10 1600   D-Y,d0-11 10   345-199  8   No-Load  7  4.06 18.26   3.8  2.91  8.98  8.98
 HKS-3000/10 3000    Dd0   10  126-70  8   No-Load  7  5.33 45   3.4  3.8  10.3 12.2 
 HKSSP-3150/10 3150  Yd11   10 230-130   5   No-Load  7  6.36  31.02  7.3  3.5  12.4 14.12 
 HKSSPZ-4000/6  4000 Yd11  6  200-59  15  On-Load  4.5 11.2   37  11.9  9.52  24.58  28.3
 HKSSP-4500/10  4500 Dd0  10    120-92  8    No-Load  6.5  8.33 48.82  8.1   4.8  15.64  17.25
 HKSSP-6000/10  6000 Yd11   10  140-100  7   No-Load  8 9.2   66.6  9.2  6.07  16.9  18.66
 HKSSPZ-6300/10  6300  Ddo   10  134-110  9  On-Load  7.7  66.5  7.5  6.92  17.5 19.8 
 HKSSP-3200/35  3200  Yd11  35  230-150  5   No-Load  7  7.11  40.13  7 5.6   15.1  16.2
 HKSSP-5600/35  5600  Yd11  35 270~160   7   No-Load  6 8.77   53.2  9.3  7.05  19  21
 HKSSP-6300/35 6300   Yd11  35  140~100  9   No-Load  7.5  9.01  69.87  9.3 6.38   18.1  21.2
 HKSSP-10000/35 10000    Yd11     35 350~170   9   No-Load 7  10.1  79.7  20.3 9.3   33.2  37
 HKSSP-12500/35  12500    Yd11  35  365~153  5   No-Load 7  16.6  95  14.9  8.7  28.7  30
 HCS-1000/10 1000     Yd11   10  80~60   No-Load 6  3.73  12.2  3.3  3.0  7.9 7.9 
 HCS-1800/10  1800    Yd11  10  105~75  5   No-Load 7  5.4  28.8  4.6 3.0   10  10
 HCSSP-3000/10  3000  Dd0 10   80~108  8   No-Load  6.5  3.9  65.5  6.6  4.2  13.7  13.7
 HCSSP-5000/10  5000    Yd11  10  120~95  5   No-Load  6.5  10.23  44.6  9.6  5.8  18.2  19.8
 HCSSP-8000/10 8000   Dd0 10   128~112  5   No-Load  7  11.9  94  10.7  8.8  19  21.83
 HCSSP-6300/35  6300    Yd11  35  126~98  8   No-Load  8  8.1 87.6   9.4 5.5   16.3  19
HCSSPZ-10000/35   10000  D-Y,d0-11  35  164~98 19   On-Load 7  16.8  91.35  17.8  14.7  37  41.2
 HCSSP-12500/35  12500  Dd0  35  165~126  13   No-Load 6.5   16.8  112.1  14.1 8.9  25.4   28.8
Certifications
Furnace Transformer for 10000kVA Three Phase Oil Arc Transformer

Certificates owned by shenda:
100MVA/220kv power transformer short circuit test report
-issued by CESI Italy&CTQC China

120MVA/33KV oil EAF transformer
50MVA/69KV oil power transformer
10MVA/33kv dry-type transformer
Type test report
-issued by KEMA Netherlands

63MVA/110KV Power transformer short circuit test report
-issued by CTQC China

12.5MVA/22KV Rectifier transformer routine test
-issued by V-Check korea

ISO 9001&ISO14001&OHSAS 18001
CE-POWER TRANSFORMER&FURNACE TRANSFORMER&DRY-TYPE TRANSFORMER&REACTOR

Transformer Characteristics
Furnace Transformer for 10000kVA Three Phase Oil Arc Transformer
Winding .
The winding must be especially protected - both against high electrical stress due to
external over voltages and against mechanical overloads by short circuits. They are made of copper or aluminum. Low-voltage windings are made of strip or flat wire while
high voltage windings are manufactured from round or profile wire. ("diamond-dotted paper") bonds the winding into a compact block
while drying and increases the short-circuit capacity additionally.

Furnace Transformer for 10000kVA Three Phase Oil Arc Transformer
Magnetic Core lamination.
The three-limb iron core is made of oblique cut Grain-oriented, seven-step silicon steel lamination insulated on both sides,
guaranteeing low losses and low noise. These values are even improved by laser treatment. It is protected on the surface with a
flash-proof varnish in order to prevent the sheet from corrosion and to reduce the noise.

Furnace Transformer for 10000kVA Three Phase Oil Arc Transformer
Oil tank.
Whether during transport or operation -the tank must be absolutely tight under mechanical stress. We have vast constructional experience, the most modern calculation methods and high-quality welding work. Special attention is paid to
corrosion protection. Pretreatment of the surface is processed by phosphating pickling, contributes to corrosion protection, just
like multi-coating with preset drying times for each layer. On request, hot-dip galvanization provides for even better protection

Furnace Transformer for 10000kVA Three Phase Oil Arc Transformer
Test lab
Testing are conducted for every transformer before delivery.Tests are classified to be routine tests and type test.
A - Routine tests: According to IEC 60076 standard , the following tests must be carried out for all units of the transformers
a- Measurement of winding resistance .
b- Measurement of voltage ratio and check of phase displacement.
c- Measurement of short circuit impedance and load losses.
d-Measurement of no-load losses and current .
e-Dielectric routine tests including the separate source AC voltage withstanding test and short duration induced over voltage withstanding test ( ACSD ) .

B - Type tests :
The following tests shall be carried out
a- Temperature rise test
b- Lightning impulse test

C - Special tests :
a- Determination of noise level according to IEC 60551 .
b- Oil leakage test
c- Overload test at 150 % rated current for one hour after temperature rise test ( top oil temperature rise and winding temperature rise must be measured and recorded in the report test also hot spot temperature rise must be calculated and recorded on the report test ) .
d- Short Circuit Dynamic stability Test (test report from independent and accredited laboratory for similar transformer will be accepted).


Packaging and transportation
Furnace Transformer for 10000kVA Three Phase Oil Arc Transformer



Company Introduction
SHENDA electric group is a manufacturer and wholesale company that manufactures good & high quality electric transformers from 2000. The company provides the customized products and OEM service. The factory own the 3 production base worldwide,2 in China and 1 in USA.We also own a transformer research institute with more than 30 electric engineers .
Furnace Transformer for 10000kVA Three Phase Oil Arc Transformer
Our Services
1. Pre-Sale Service
- Quick response: reply you within 8 hours, to save your time.
- Professional solution: supply professional completed solution base on your technical requirements,  to complete your technical plan.
- Quoataion: submit a competive price within 2 days, to promote your business

2. In Sale Service
- Supplying stipulated completed drawings
- Supplying manufacturing plan and processing photos
- Making the test plan and book hotel for the witness person
- Making good arrangement of the delivery and shipment

3. Afer Sale Service
- Supplying professional supervision and commissioning within 15 days
- Training the workers
- Providing 12 months waranty of quality and perforance

Furnace Transformer for 10000kVA Three Phase Oil Arc Transformer

RFQ
1,Q:
Are you manufacturer?
 
   A:
Yes, we are manufacturer. Our factory is in JiangShan City, zhejiang  Province.
 
2,Q:
What is your delivery time ? 
 
   A:
Depend on the type of transformer.
 
3,Q:
What is your payment term?
 
  A:
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
 
4,Q:
Are your transformers supported for customization ?
 
  A:
Yes, of course. We can design and produce accroding to the technical requirements and parameters of customers.
 
5,Q:
Do you offer guarantee for the products?
 
   A:
Yes. Different transformers is different. We offer at least one year guarantee for all of our transformers.
 
6,Q:
Do you accept Factory Acceptance Test?
 
   A:
Yes. It's available. And we are responsible for each set transformer's testing (ICE).
 
7,Q:
Do you assign engineer for after-sale service?
 
   A:
Yes. For our products,we all provide after-sale installation instructions service
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier